
|
Pressure
Grouting
Pressure grouting is normally specified after mechanical jacking.
Grouting is not normally required unless the slab deflects substantially as it
is lifted.
If your project requires soil compaction
or other forms of specialty grouting please contact our offices for further
information.
Call us today to schedule an inspection of
your property.
512-443-2920
|
|
|
Grouting During Drought
Underslab void grouting should never be
done during a prolonged drought when the foundation is constructed on
expansive soils. If the void is filled and the soils then expand with
subsequent rainfall the foundation will be lifted beyond desired elevations.
Office Hours
Our offices are open Monday through
Friday
9 a.m. - 5 p.m.
|
Hire
an Experienced Grouting Contractor
Improper grouting can severely
damage your foundation. Make sure your grouting contractor is
experienced.
|
|